Utility-scale solar development to Ready to Build

Utility-scale development

Large-scale projects, ready to build

We develop solar plus storage generation assets through Ready-to-Build stage: secured site, technical studies, CENACE interconnection and CNE generation permit resolved. For investment funds, IPPs, and large offtakers.

The challenge

Capital is abundant; well-developed projects are not

The bottleneck of the energy transition isn't financing; it's projects with site, interconnection, and permits truly resolved. Regulatory and interconnection processes are complex and derail timelines when not managed with local expertise.

Many projects reach the market without firm land control, with incomplete studies, or with poorly sized regulatory risk, and the investor finds out during due diligence.

Our job is to deliver exactly the opposite: Ready-to-Build projects with every deliverable resolved and documented to bankability standards.

Under the 2025–2026 framework (Electricity Sector Law, binding planning and the storage requirement for new solar generation), a project is only Ready to Build if it has interconnection capacity confirmed by CENACE, a CNE generation permit and storage sized from the design stage. We develop with those criteria from day one.

How it works

Our development process

We manage every critical development stage with technical and regulatory rigor.

01

Site

Land identification and securing with long-term legal control.

02

Studies

Solar resource, geotechnical, environmental, and social: complete base engineering.

03

Interconnection

CENACE interconnection studies (system and facilities impact) and an interconnection agreement under the current model.

04

Permits

CNE generation permit, social impact assessment before SENER, federal and state environmental review, and municipal licenses, through to approval.

05

Ready to Build

Delivery of the project ready for construction or investment, fully documented.

Benefits

Why invest in our pipeline

Pipeline in development

A portfolio of large-scale projects at different stages of maturity.

Proven regulatory management

Real experience navigating Mexico's power sector regulatory framework.

Solid land control

Long-term legal structures that give certainty to the project and the investor.

Rigorous base engineering

Technical studies to international bankability standards.

Storage from the design stage

Hybrid solar plus storage projects sized to meet current grid requirements and capture value in high-demand hours.

An operator's vision

We develop with operations in mind: projects are born optimized for the long term.

Deliverables

Ready-to-Build deliverables

Every project is delivered with the four critical fronts resolved and documented.

01

Secured site

Long-term legal land control with legal certainty for the project and the investor.

02

Interconnection

CENACE-approved interconnection studies, known cost of works, and an interconnection agreement ready for signature.

03

Permits

CNE generation permit and environmental, social, and municipal authorizations obtained and current.

04

Technical studies

Solar resource, geotechnical, environmental, and social studies to international bankability standards.

Who it's for

Who is it for?

01

Investment funds

Infrastructure and energy vehicles looking for quality projects ready for construction.

02

IPPs and generators

Independent producers that want to grow their portfolio without carrying the full development cycle.

03

Large offtakers

Large-scale industrial consumers that need dedicated energy through long-term contracts.

Frequently asked questions

Development frequently asked questions

A project with registered long-term land control, complete technical studies, CENACE-approved interconnection studies with a known cost of works, a CNE generation permit and current environmental and social authorizations. Ready to start construction or receive investment.